Overview of the Shipment
- Mode of Transport: Rail Freight (LCL – Less than Container Load)
- Route: Pinghu South Station, China → Moscow, Russia
- Cargo Details:
- Product: Mold Parts
- HS Code: 8208101900
- Packaging: 10 Pallets
- Weight: 7,884 kg
- Volume: 15.77 CBM

Why Choose Rail Freight for Mold Parts?
- Cost-Effective: Rail freight offers an affordable alternative to air freight, particularly for heavy goods like mold parts.
- Reliability: Fixed schedules and dedicated rail routes ensure predictable delivery timelines.
- Sustainability: Rail transport is more environmentally friendly compared to air or road freight.
Step-by-Step Shipping Process
1. Cargo Preparation
Proper preparation was key to ensuring the mold parts were safely transported:
- Packaging Strategy:
- Each mold part was packed in durable cartons and secured on pallets.
- Moisture-resistant wraps were used to protect against environmental conditions.
- Pallet Optimization: Pallets were stacked and strapped to maximize space utilization while ensuring stability during transit.
2. Documentation for Customs Clearance
Accurate documentation was prepared to ensure compliance with export and import regulations:
- Commercial Invoice: Included detailed product descriptions and HS Code (8208101900).
- Packing List: Provided information about the weight, volume, and quantity of pallets.
- Export Declaration: Facilitated the customs process at Pinghu South Station.
Customs officials at both departure and arrival points reviewed the documents to verify compliance.
3. Rail Freight Consolidation
The shipment was part of a consolidated container to optimize costs:
- Efficient Loading: Mold parts were loaded alongside compatible goods to ensure container stability.
- Tracking System: The shipment was monitored at key checkpoints along the rail route.
4. Transit Details
The Pinghu South Line provided a direct and efficient route to Moscow:
- Route:
- Departed from Pinghu South Station.
- Passed through transit hubs in Kazakhstan and Belarus.
- Arrived at Moscow Railway Terminal.
- Transit Time: Approximately 18 days.
5. Arrival in Moscow and Final Delivery
Upon arrival in Moscow:
- Customs clearance was completed seamlessly due to pre-verified documentation.
- The shipment was transferred to a local trucking service for final delivery to the client’s warehouse.
Advantages of Rail Freight for This Shipment
Benefit | Details |
---|---|
Cost Efficiency | Reduced overall logistics costs compared to air freight. |
High Capacity | Rail containers accommodated the heavy and bulky mold parts effectively. |
Predictable Timelines | Fixed rail schedules ensured the cargo arrived on time. |
Environmental Impact | Rail transport reduced the carbon footprint compared to road or air freight. |
Tonlexing’s Expertise in Rail Freight Logistics
Tonlexing specializes in end-to-end logistics solutions tailored for heavy industrial shipments. Our rail freight services include:
- Consolidated Cargo Options: Cost-efficient transport for partial loads.
- Customs Support: Expertise in navigating cross-border trade regulations.
- Real-Time Tracking: Transparency throughout the shipment journey.
Explore More Destinations
We also provide rail freight services to the following destinations:
Client Benefits
- Efficient Handling: Proper packaging ensured that mold parts arrived in perfect condition.
- Cost Savings: The consolidated cargo method reduced shipping expenses.
- Timely Delivery: Predictable rail schedules kept the project timeline on track.
This shipment of mold parts from China to Russia demonstrates the efficiency and reliability of rail freight for heavy and bulky goods. By leveraging Tonlexing’s expertise, the client achieved cost-effective and timely delivery of their cargo.
Discover how rail freight from China to Russia can optimize your logistics operations and enhance your global supply chain.