Shipment Overview
Details | Specifications |
---|---|
Mode of Transport | Sea Freight (Door-to-Door) |
Origin | Ningbo, China |
Destination | USA (Final delivery to client’s location) |
Commodity | Pad Mounted Transformers |
HS Code | 8504210000 |
Packaging | 2 Wooden Crates |
Weight | 1,900 kg |
Volume | 3.91 CBM |

This shipment involved transporting pad-mounted transformers from Ningbo, China, to a U.S. location via door-to-door sea freight. Given the high value and technical nature of electrical equipment, special care was taken to ensure safe handling, robust packaging, and smooth customs clearance.
The 75kVA and 100kVA transformers are critical for power distribution, requiring reliable and secure transportation to prevent damage. This case highlights the logistics, challenges, and solutions employed for a successful delivery.
Why Sea Freight for Heavy Equipment?
Cost-Effective for Bulky Goods – Sea freight is the most economical option for heavy transformers compared to air freight.
Secure Handling – Specialized loading and unloading ensure safe transport.
Reliable Scheduling – Predictable transit times ensure smooth project planning.
Door-to-Door Convenience – Complete logistics solutions eliminate coordination hassles for the client.
Logistics Process
1. Cargo Preparation & Packaging
Since transformers are sensitive to impacts and moisture, they were packed securely:
Custom Wooden Crates – Sturdy wooden boxes provided maximum protection.
Shock Absorption – Internal foam padding minimized vibration effects.
Weatherproofing – Moisture-resistant wraps prevented corrosion.
Clear Labeling – Handling instructions such as “Heavy Cargo” and “This Side Up” ensured proper positioning.
2. Export Documentation & Customs Clearance
A complete set of export documents ensured smooth clearance:
Commercial Invoice – Listed product details, HS Code (8504210000), and declared value.
Packing List – Included weight, dimensions, and number of crates.
Bill of Lading (B/L) – Confirmed shipment and tracking details.
Export Declaration – Ensured compliance with Chinese regulations.
3. Sea Freight from Ningbo to the USA
The shipment was loaded into a 20-foot container and transported via a reliable shipping carrier:
Route: Ningbo → Major U.S. Port → Final Destination
Transit Time: Approximately 25-30 days
Secure Container Loading: Transformers were secured with straps and wooden blocks to prevent movement during transit.
4. Import Customs Clearance & Duties in the USA
On arrival at the U.S. port, customs clearance was completed efficiently:
Verification: Customs officials inspected product descriptions and HS Codes.
Duty Assessment: Import taxes calculated based on transformer classification.
Compliance Check: Ensured alignment with U.S. electrical safety standards.
5. Final Delivery to the Client
After customs clearance, the shipment was transported via specialized trucking to the client’s location:
Handling Equipment: Forklifts were used for unloading.
Final Inspection: Transformers were checked upon arrival.
Delivery Time: Completed within 48 hours after customs release.
Challenges & Solutions
Challenge | Solution |
Handling Heavy Cargo | Used reinforced wooden crates and secure strapping. |
Risk of Electrical Component Damage | Applied moisture-resistant and shockproof packing. |
Customs Regulations | Submitted detailed documentation for smooth processing. |
Delivery to Final Location | Arranged specialized trucking for heavy cargo. |
Advantages of Sea Freight for Electrical Equipment
Cost-Effective for Large Items – Compared to air freight, sea shipping saves substantial costs.
Safe & Secure – Custom packaging and container security reduce risks.
Flexible Delivery Options – Door-to-door service ensures smooth handling from origin to destination.
Global Reach – Reliable ocean carriers facilitate seamless international trade.

More Logistics Case Studies 📖
Explore additional case studies to see how we handle different types of shipments:
Procurement & Shipping Guides 📌
Enhance your knowledge with our expert logistics guides:
Why Choose Tonlexing for Heavy Equipment Shipping? ✅
Expert Handling – Specialized experience in industrial and electrical equipment logistics.
Custom Packaging Solutions – Protection against shocks, moisture, and external impacts.
Seamless End-to-End Service – From port handling to final delivery.
Compliance Assurance – Ensures smooth customs clearance without delays.
Real-Time Tracking – Stay updated at every stage of the shipment.
This successful door-to-door sea freight shipment of pad-mounted transformers from Ningbo to the USA illustrates Tonlexing’s expertise in handling industrial electrical equipment. By implementing robust packaging, meticulous documentation, and efficient transportation planning, we ensured a safe and timely delivery.
For your sea freight needs, contact Tonlexing and let us handle your heavy cargo shipments with expertise and precision.